NYSDOT restored the roadway surface between 131st and 167th streets and installed new pavement markings, LED lighting, and ground-mounted signage to enhance visibility, reflectivity and readability. Drainage also was improved to reduce the pooling of water and the potential for icy conditions on the highway.
Source: News feed
Hotline: (+800) 292-8240
E-mail: info@accsafety.com